This shows "Henry's Concrete" crew applying bracing to the Nudura styrofoam blocks as they erect the hollow walls.
![]()
Here is the "Northeast Concrete Pumping" truck pouring the concrete into the
hollow Nurdura "lego's" after they have had rebar put in place.
Note: articulating arm is high than the trees!!!
![]()
![]()
This fellow has a RF remote control unit around his waist to control the
pumper arm movement and to regulate the flow of concrete.
(I bet he is good at video games!)![]()
Here is the poured floor with the radiant heat embedded.
Note: pipes under the floor to carry electrical, audio, CAT6 and telephone cables.
![]()
Finished concrete work.
![]()
Setting the trusses on the main room and raftering the lounge and bathroom.
Note: cathedral ceiling with scizzor trusses.